Renovation Companies in Dubai: One Contractor from Permit to Handover

The Property Masters is a Dubai renovation company and licensed contractor, covering home and villa renovation across all seven emirates. The question that decides most Dubai renovations is not the finish — it is whether the works need a permit, and who is allowed to submit it. We answer that first, then design, build and hand over under one contract. Founded in 2025, fully licensed and certified, and working in line with ISO 9001 principles, with a fixed price after a free site visit and a 12-month defects-liability period in line with UAE market practice.

Renovation or fit-out? The distinction that changes your paperwork

A fit-out turns a bare or newly leased space into a finished one. A renovation reworks a space that is already built and usually already occupied. In Dubai the practical difference is the approval chain:

  • Cosmetic works — painting, flooring, joinery replacement, re-tiling like-for-like — generally do not need an authority permit, though your building or community may still require its own NOC.
  • Anything that moves walls, wet areas, services or structure — a new bathroom position, a knocked-through kitchen, re-routed MEP — is a modification, and that is a permit conversation.

Getting this wrong is the single most expensive mistake in a Dubai renovation, because work stops when the building notices. See internal modification approval for where the line actually sits, or the fit-out approvals hub for the full picture.

What we renovate

  • Villa renovation — whole-home reworks, extensions and external works
  • Apartment renovation — where building management rules bind tighter than the authority permit
  • Kitchen renovation — layout, joinery and the MEP moves behind it
  • Bathroom renovation — waterproofing, falls and drainage before anything decorative
  • Whole-home refresh — flooring, ceilings, joinery, lighting and paint as one coordinated programme

Why renovation goes wrong in Dubai specifically

The permit question is answered too late

By the time a contractor is on site with a sledgehammer, the answer needs to have been "yes, and here it is." We establish jurisdiction and permit scope during the survey, before anything is priced.

The building has rules the authority does not

Community and tower managements issue their own renovation guidelines, working-hours windows, service-lift bookings, approved-contractor lists and a refundable deposit. These are commercial terms, not statutory ones, and they are usually what actually paces a residential renovation.

Existing conditions are unknown until they are opened

An occupied property hides its services. Budgeting a renovation like a new build — no contingency, no allowance for what is behind the wall — is how a fixed price stops being fixed.

The climate punishes the shortcuts

Heat and humidity find unsealed board edges, temperate-rated adhesives and missing movement joints. In a renovation you are also tying new work into old substrates, which is where waterproofing failures start.

What a renovation costs

Fit-out in Dubai starts from AED 250 (Essential), AED 450 (Premium), AED 800 (Luxury) per square foot, before 5% VAT and a typical ~10% contingency.

Against an apartment base, villas run roughly 1.8x, townhouses roughly 1.4x and offices roughly 1.3x. These are indicative ratios, not a rate card, and the real driver in a renovation is how much has to be removed before anything is built.

For what moves a project between bands, and the five costs that sit outside the rate, see the fit-out cost guide.

How the programme runs

  1. Survey and permit scoping — measure, establish jurisdiction, and confirm what needs approval before anything is drawn
  2. Design and specification — layouts, finishes, MEP and a transparent bill of quantities
  3. Approvals — building or community NOC first, then the authority submission where the works require one
  4. Procurement — long-lead items ordered at design freeze rather than at permit
  5. Strip-out and build — phased around occupancy where you are living in the property
  6. Snagging and handover — defects closed, then the defects-liability period begins

What sets your date is the approval sequence, not the build. See what sets your fit-out timeline, and fit-out handover for what has to close at the end.

Choosing a renovation contractor

The checks are the same ones that separate fit-out contractors: is the entity licensed to carry the works, does it make the authority submissions itself, is the price fixed against a defined scope, and does anyone stay accountable after handover. Our guide to choosing a fit-out contractor in Dubai sets out all six and the exact question to ask for each.

Because we also run facilities management, the team that renovates the property can maintain it afterwards. For commercial work, see interior fit-out works or office fit-out.

Frequently Asked Questions

Do I need a permit to renovate in Dubai?

It depends on what the works touch. Cosmetic works — painting, flooring, like-for-like re-tiling, replacing joinery — generally do not need an authority permit, though your building or community may still require its own NOC. Anything that moves walls, wet areas, services or structure is a modification and does need one. We establish the answer during the survey, before anything is priced.

What is the difference between a renovation and a fit-out?

A fit-out turns a bare or newly leased space into a finished one. A renovation reworks a space that is already built and usually occupied. The practical difference in Dubai is the approval chain and the constraints: a renovation has existing services behind the walls, an occupier to work around, and building management rules that a bare-shell fit-out does not.

How much does a renovation cost in Dubai?

Indicatively, from AED 250 per square foot for an essential specification, AED 450 for premium and AED 800 for luxury, before 5% VAT and a typical 10% contingency. Against an apartment base, villas run roughly 1.8x and townhouses roughly 1.4x. The real driver in a renovation is how much has to be removed before anything is built. A fixed price follows a free site visit.

Can I live in the property during the renovation?

Often yes, if the works are phased. Whole-home reworks that move services or wet areas are usually faster and cheaper with the property empty, because trades are not working around occupancy and dust containment is simpler. We set out both options with the programme so it is a decision rather than an assumption.

Who deals with the building management?

We do. Community and tower managements issue their own renovation guidelines, working-hours windows, service-lift bookings, approved-contractor lists and a refundable deposit. These are commercial terms rather than statutory ones, and in a residential renovation they usually pace the job more than the authority permit does.

Why do renovation quotes vary so much?

Because they are often pricing different scopes. A quote without a bill of quantities is an estimate that will be re-measured, and one without a contingency has moved the risk of unknown existing conditions to you rather than removing it. Compare the exclusions list before the headline number.